₹6 CRORE EQUITY FOR 6% / PHASE 1 SPV

Invest in a 5 TPD CBG platform designed to scale.

The first Rajasthan project converts agricultural biomass into transport-grade clean gas and bio-fertiliser—forming the operating blueprint for a five-plant portfolio.

DEVELOPMENT STATUS Investor discussions openRajasthan, India
EQUITY SUBSCRIPTION₹6 Cr
STRUCTUREPhase 1 SPV
INVESTOR OWNERSHIP6%
REFERENCE PRE-MONEY₹94 Cr
Discuss the opportunity

Policy update · 15 September 2026

The investment terms stay the same. The project framework is stronger.

Tejomay continues to raise ₹6 crore for 6% equity in the first 5 TPD project SPV. India's new GOBARdhan operational framework adds clearer support for offtake, pricing, capital assistance, pipeline connectivity and eligible project debt.

Read the full investor update
CAPITAL SUPPORT POTENTIALUp to ₹10 Cr

For an eligible 5 TPD project, subject to approved costs, milestones and scheme sanction.

ADMINISTERED PRICE₹2,110/MMBtu

The announced benchmark strengthens revenue visibility; applicable terms and annual revisions remain relevant.

ELIGIBLE TERM LOANUp to 85% cover

A credit-guarantee route can improve lender confidence for qualifying MSME projects.

OFFTAKEFirm framework

Tripartite CGD-led contracting is intended to turn demand obligations into bankable plant-level arrangements.

All scheme benefits are subject to eligibility, application, appraisal, sanction, available funds and continuing operational compliance. No benefit is represented as already approved for Tejomay.

Project at a glance

A replicable CBG platform, starting with one disciplined plant.

The first project establishes the technical, feedstock and offtake model for a wider Rajasthan cluster.

5 TPDPhase 1 CBG nameplate capacity
5 plantsLong-term portfolio vision
RajasthanBharatpur–Dhaulpur development cluster
5 LOIsBPCL offtake interest secured

Circular by design

One input stream. Multiple forms of value.

Feedstock planning, controlled digestion, gas upgrading and nutrient recovery work as one operating system—not disconnected activities.

Process diagram showing organic feedstock entering a digester, gas upgrading and fertiliser outputs
CBG production flow retained from the original Haritika presentation.
  1. 01
    Local biomass

    Napier grass and suitable locally available organic feedstocks.

  2. 02
    Anaerobic digestion

    Organic material is converted into biogas in a controlled process.

  3. 03
    Gas upgrading

    Biogas is purified and compressed into transport-grade CBG.

  4. 04
    Nutrient recovery

    Digestate becomes a potential soil-input and bio-fertiliser stream.

Why Tejomay

Infrastructure that links climate value with rural economics.

Market-linked output

CBG is designed for compressed-gas delivery into India’s transport-fuel ecosystem.

Lower resource waste

Agricultural biomass becomes productive feedstock instead of a disposal burden.

Farm-side value

Structured feedstock relationships can create added local income and demand.

Work with Tejomay

We are building the Phase 1 partner network.

Project financeEPC & technologyFeedstockOfftake
Start a conversation